Technology and stages of brickwork
In order for the brick building to be as reliable and durable as possible, masonry of the material must be performed in strict accordance with the established technology.
Brick masonry necessarily begins from the edge of the wall, for which, in order to lay the first row on the base, a ridge of a solution is laid, about 1.5 cm high on which a brick is laid with a slight pressing of it into the solution. By laying the next brick, apply the solution on its end side and lay down next to the previous one, while pressing it to it.
When laying the second row, bricks should be laid with a peculiar dressing of seams, in which the seam between the bricks of the previous row falls on the middle of the brick of the next row. After laying several seams, make an extension that helps to compact the solution between bricks.